top of page

ABOUT

Superior Pool Paint is avalable in 7.56 litre kits. Each kit contains a 3.78 litre base colour which is mixed 1:1 with the  3.78 litre hardener. So after you order you will receive 1 can of Superior Pool Paint in the colour of your choice and 1 can of Superior Pool Paint hardener, which must be mixed together before application.

 

Coverage of a 7.56lt kit is 35-40 sqm per coat by brush and roller, a minimum 2 coats is recommended for a long lasting finish.

 

Convenient 1:1 mixing

GENERAL INFORMATION
Easy to apply - Fast recoat time - 1:1 Mixing - Chemical and heat resistant - Long lasting finish

 

  • Pools previously coated with EPOXY will require abrading and cleaning before Superior Pool Paint can be applied.

 

  • Superior Pool Paint cannot be applied to chlorinated rubber or acrylic pool coatings. These must be removed completely.

 

  • Preparation of the pool should be with a cleaner degreaser and high pressure washed with clean water, then given sufficent time to dry before coating.

 

  • To test the dryness of concrete, gunite or plaster pool surfaces, securely tape a .5m by .5m piece of clear plastic onto a horizontal and vertical surface at the deep end of the pool.

 

  • Check after 24 hours. If water condensation is visible under the plastic, this is an indication that the surface is not completely dry, and NOT suitable for coating.

  • Avoid painting in hot midday sun. Application is recommended early in the day or late in the afternoon when at least 2 hours of sunlight remain after completion of the job.

 

  • Make sure that both tins are stirred thoroughly before mixing together and that the combined quantity is also mixed well before application.

 

  • 1:1 Part mixing is acceptable if a whole kit quantity is not required.

 

  • One 7.56 litre kit will cover between 35-40 square metres per coat, depending on the substrate and application method.

  • The 2nd coat can be applied the following day, and best before 48hrs has lapsed.

 

  • A 3rd coat may be applied if required.

 

  • When application is complete, allow your pool to remain empty for 5-7 days to fully harden before refilling.

BRIEF APPLICATION GUIDE

bottom of page